The Maharashtra State Road Development Corporation (MSRDC) is set to revolutionize connectivity with the development of the 179.85 km Jalna-Nanded Expressway. The project, aimed at enhancing transportation infrastructure, witnessed the opening of bids on Thursday, attracting bids from 10 prominent civil engineering firms, signaling a significant step forward in Maharashtra's development landscape.
The Jalna-Nanded Expressway, a 6-lane access-controlled highway, is poised to redefine travel between the cities of Jalna and Nanded. With a northern terminal at the Mumbai-Nagpur Expressway (Samruddhi Mahamarg or ME-2), this ambitious project is designed to facilitate smoother and faster transportation, boasting a speed limit of 120 kmph.
Bidding Process and Participation
The bidding process for the project saw active participation from 10 civil engineering firms. After the Request for Qualification (RfQ) round in April 2023, wherein 28 firms submitted applications, 18 firms progressed to the Request for Proposal (RfP) round in December 2023. The opening of bids in January 2024 marked the next phase, with 10 firms submitting a total of 23 bids for various packages.
Key Players and Packages
Among the notable bidders, Afcons Infrastructure Ltd., APCO Infratech Pvt. Ltd., GR Infraprojects, IRCON International, J Kumar Infraprojects, Montecarlo Ltd., Oriental Structural Engineers, NCC Ltd., PNC Infratech, and Roadway Solutions India Infra showcased their interest in different packages of the expressway project.
Bidders and Packages:
Bidder | Packages |
---|---|
Afcons Infrastructure Ltd. | JNE-1 |
APCO Infratech Pvt. Ltd. | JNE-1, JNE-2, JNE-3, JNE-6 |
GR Infraprojects | JNE-6 |
IRCON International | JNE-2, JNE-5, JNE-6 |
J Kumar Infraprojects | JNE-4 |
Montecarlo Ltd. | JNE-2, JNE-3, JNE-4, JNE-5, JNE-6 |
Oriental Structural Engineers | JNE-4 |
NCC Ltd. | JNE-1, JNE-2, JNE-3 |
PNC Infratech | JNE-4, JNE-5 |
Roadway Solutions India Infra | JNE-5, JNE-6 |
Package Details
The expressway project is divided into six packages, each covering specific stretches:
- JNE-1 to JNE-6, spanning from 0.000 to 179.85 km, with individual lengths ranging from 19.82 km to 36.09 km.
Package | Length (km) | Chainage Range | Contractor |
---|---|---|---|
JNE-1 | 36.09 | 0.000 to 36.09 | To Be Declared |
JNE-2 | 30.46 | 36.09 to 66.55 | To Be Declared |
JNE-3 | 32.44 | 66.55 to 98.99 | To Be Declared |
JNE-4 | 28.85 | 98.99 to 127.84 | To Be Declared |
JNE-5 | 32.19 | 127.84 to 160.03 | To Be Declared |
JNE-6 | 24.30 | 160.03 to 179.85 | To Be Declared |
Conclusion
The Jalna-Nanded Expressway project represents a significant stride towards enhancing connectivity and fostering economic growth in Maharashtra. As the project progresses, it is expected to reduce travel time between Nanded and Mumbai from 11 hours to 6 hours, unlocking new opportunities for development and prosperity.
Stay tuned for further updates as the project unfolds and the winning bids are announced, paving the way for a brighter, more connected future for Maharashtra.
. Financial bids are expected to be unveiled only after the conclusion of the Lok Sabha elections' model code of conduct. Stay tuned to discover the winners for each package! Additionally, on Thursday, MSRDC opened bids for the 136.80 km Pune Ring Road and the 126 km Virar-Alibaug Multi-Modal Corridor projects. Follow the provided links to explore bidder and package details. For the latest updates, visit the Expressway section or the Home Page!