The proposed Haryana Orbital Rail Corridor (HORC) project is set to revolutionize transportation infrastructure in the state, connecting key regions through a 121.742 km semi high-speed rail line. Linking Harsana Kalan in Sonipat to Asaoti in Palwal, this corridor traverses 17 stations along the Kundli – Manesar – Palwal (KMP) / Western Peripheral Expressway, with an estimated cost of Rs. 4,822.69 crore.
Strategic Objectives: The HORC project aims to alleviate congestion in Delhi by offering an alternative route and facilitating seamless interchange connectivity with Indian Railways' main radial routes, the Dedicated Freight Corridor (DFC) at Pirthala, and the Delhi – SNB RRTS Line at Panchgaon.
Project Development: The project garnered in-principle approval from the Haryana government in December 2018. It will be executed by the Haryana Rail Infrastructure Development Corporation (HRIDC) and financed by the Asian Infrastructure Investment Bank (AIIB) through a $400 million loan. In 2021, RITES – SMEC JV was appointed as the project's General Consultant, marking a significant milestone in its progression.
System Specifications and Key Figures: With a top speed of 160 kmph and an average speed of 120 kmph, the HORC project operates on a broad gauge track with a traction system of 25 KV AC overhead catenary (OHE). As of April 15, 2020, the estimated project cost stands at Rs. 4,822.69 crore. However, no official deadline has been announced yet.
Route Information: The corridor spans 121.742 km primarily at-grade, with some sections elevated. While specific station details are pending, expectations include new stations at strategic points such as Tarakpur, Asoada, Mandhoti, Badli, Sultanpur, Patli, Manesar, Panchgaon, Chandla Dungerwas, and IMT Sohna. Additionally, existing stations at Asaoti, Pirthala Yard, and Harsana Kalan will serve as key interchanges.
Route Map and Future Prospects: While the alignment is undergoing finalization, the indicative route map showcases the corridor's trajectory, promising enhanced connectivity and logistical efficiency upon completion.
The Haryana Orbital Rail Corridor (HORC) project stands as a testament to the state's commitment to infrastructure development and economic progress. As it continues to unfold, it is poised to transform transportation dynamics and catalyze growth across Haryana.
Contract | Contractor / Status |
---|---|
General Consultant: Haryana Orbital Rail Corridor (HORC) | RITES – SMEC JV |
Package C1: Design & Construction, Manesar Station to Patli Railway Station | KCC Buildcon |
Package C2: Composite Works Contract (Civil, OHE, Electrical, and S&T) | Tender cancelled in September 2022 |
Package C4: Design & Construction, Twin Tunnel (NATM and Cut & Cover) | Rail Vikas Nigam Ltd. (RVNL) |
Package C5: Design & Construction, Pirthla to Dhulawat stations | Dilip Buildcon (DBL) is the lowest bidder |
Package C6: Design and Construction, New Patli to Harsana Kalan and connectivities | Bidding Underway |
Package C23: Design and Construction, Earthwork, Bridges, Station Buildings, Retaining Walls, etc. | PNC Infratech |
This table lists the contracts and their respective contractors or statuses involved in the Haryana Orbital Rail Corridor (HORC) project.