Raipur Dhanbad Expressway – Package Wise Details

The Raipur Dhanbad Expressway (NH / EC-07), a part of the ambitious Raipur Dhanbad Economic Corridor, is currently under construction. This 707 km long, four-lane access-controlled expressway will cut across Chhattisgarh and Jharkhand, transforming connectivity across central and eastern India.

Strategically designed under the Bharatmala Pariyojana, this expressway will promote industrialization in the region by providing faster connectivity to coal reserves, mining zones, and industrial hubs across Raipur, Bilaspur, Korba, Jashpur, Ranchi, Bokaro, and Dhanbad.

It will reduce travel time between Raipur and Dhanbad from 16 hours to just 9 hours, while also cutting the distance down from 750 km to 707 km. The corridor will be developed as a mix of greenfield and brownfield stretches — with the Raipur–Bilaspur section upgraded to a six-lane brownfield expressway, while the rest will be developed as new greenfield alignments.

Raipur Dhanbad Expressway
Raipur Ranchi Dhanbad Expressway

Key Sections of the Raipur Dhanbad Expressway

  • Raipur–Bilaspur (Brownfield) – 6 lanes
  • Bilaspur–Urga (Greenfield) – 4 lanes
  • Urga–Pathalgaon (Greenfield) – 4 lanes
  • Pathalgaon–Gumla (Greenfield) – 4 lanes
  • Gumla–Ranchi (Greenfield) – 4 lanes
  • Ranchi–Bokaro (Greenfield) – 4 lanes
  • Bokaro–Dhanbad (Greenfield) – 4 lanes

Raipur Dhanbad Expressway Package-Wise
Summary Table

Package Details Section Length (Approx.) Type Status / Bidders Estimated Cost (₹ Cr.) Package Wise Bidders Details
Pkg – 1 Raipur – Bilaspur ~125 km Brownfield (6 lanes) DPR approved ~3,500 Cr. Yet to be invited
Pkg – 2 Bilaspur – Urga ~70 km Greenfield (4 lanes) Bidding stage ~2,200 Cr. Not disclosed
Pkg – 3 Urga – Pathalgaon ~120 km Greenfield (4 lanes) Bidding stage ~3,000 Cr. Not disclosed
Pkg – 4 Pathalgaon – Kunkuri – CG/JH Border 104.25 km Greenfield (4 lanes) Bids opened – Krishna Constructions L1 (₹1,953 Cr.) 2,356.30 Cr. Krishna Constructions (L1), Megha Engineering, Dilip Buildcon, PNC Infratech 

Click here for Details
Pkg – 5 Gumla – Ranchi ~140 km Greenfield (4 lanes) Tendering ~3,400 Cr. Yet to be invited
Pkg – 6 Ranchi – Bokaro ~80 km Greenfield (4 lanes) Tendering ~2,000 Cr. Yet to be invited
Pkg – 7 Bokaro – Dhanbad ~68 km Greenfield (4 lanes) Tendering ~1,800 Cr. Yet to be invited

Economic Impact

  • Industrial Boost: The corridor passes through coal-rich belts and industrial towns, creating opportunities for logistics, mining, and allied industries.
  • Travel Time Reduction: From 16 hours to just 9 hours between Raipur and Dhanbad.
  • Seamless Connectivity: Links the Eastern Economic Corridor (Paradip Port – Bihar border) with central India.

Check Other Economic Corridors

Interested in exploring more? 👉 Click here to see the full list of ongoing and planned Economic Corridors in India

🔹 Internal Links


🔹 External Links

Leave a Reply

Your email address will not be published. Required fields are marked *