Raipur Dhanbad Economic Corridor | Pathalgaon Kunkuri – CG / JH Border Highway Bidding Results

The National Highways Authority of India (NHAI) has announced the results of financial bidding for the Pathalgaon–Kunkuri–CG/JH border section of NH-43, a crucial stretch of the Raipur Dhanbad Economic Corridor under Bharatmala Pariyojana.

The project involves the construction of 104.25 km highway from Turua Ama village to Putrichoura village in Chhattisgarh, designed to boost coal evacuation, reduce travel time, and improve connectivity between central and eastern India.


Raipur Dhanbad Economic Corridor Project Overview

  • Corridor: Raipur–Dhanbad Economic Corridor (Bharatmala Pariyojana) click here for project details.
  • Highway: Pathalgaon–Kunkuri–CG/JH Border (NH-43)
  • Length: 104.25 km
  • Estimated Cost: ₹2,356.30 crore
  • Project Mode: EPC / 4-lane Greenfield Highway
  • Authority: NHAI
  • Bid Submission: 29 August 2024
  • Financial Bid Opening: 04 November 2024

Raipur Dhanbad Economic Corridor | Pathalgaon Kunkuri Alignment

Financial Bid Results

The bidding process attracted top infrastructure developers from across India. Krishna Constructions emerged as the lowest bidder (L1) with a bid of ₹1,953 crore, undercutting several industry giants.

Here’s the complete list of bidders:

BidderBid Value (₹ Cr.)Status
Krishna Constructions1,953.00 L1 Winner
Shivalaya2,056.30L2
MKC2,093.33L3
RKC Infra2,111.00L4
CEIGALL2,129.00L5
CDS2,145.00L6
KCC2,148.31L7
DBL2,154.60L8
HG Infra2,167.11L9
GRIL2,178.97L10
DRA2,186.10L11
RVNL2,226.00L12
Gawar2,255.99L13
Bharat Vanijya2,502.00L14
Patel Infra2,515.34L15
OSE2,590.55L16
NKC2,331.08L17
Vishwa Samudra❌ Disqualified
VRC❌ Disqualified
JSP Projects❌ Disqualified
PNC❌ Disqualified

Importance of Raipur Dhanbad Economic Corridor Project

This stretch of NH-43 is part of the Raipur–Dhanbad Economic Corridor, which is being developed under the Bharatmala Pariyojana to:

  • Improve coal transportation between Chhattisgarh and Jharkhand.
  • Reduce logistics costs and travel time.
  • Strengthen industrial and regional connectivity.
  • Facilitate economic growth in eastern and central India.

The successful bidding marks another milestone in India’s push towards world-class infrastructure and faster execution of highway projects.

Explore More Economic Corridors

Looking to explore other major highway and corridor projects under Bharatmala Pariyojana?

Check the full list of Economic Corridors here


🔗 References

One thought on “Raipur Dhanbad Economic Corridor | Pathalgaon Kunkuri – CG / JH Border Highway Bidding Results

Leave a Reply

Your email address will not be published. Required fields are marked *