The AUDA – Ahmedabad Urban Development Authority has floated two major tenders worth ₹2,220 crore for the widening and upgrading of the 76 km-long Sardar Patel Ring Road encircling Ahmedabad. This project, aimed at strengthening urban mobility, will convert the existing road into a 6-lane corridor, while also upgrading service roads to enhance connectivity and reduce traffic congestion.
The Sardar Patel Ring Road, also known as the SP Ring Road, is one of Ahmedabad’s most critical transport corridors, facilitating intercity and intracity traffic. With increasing vehicular load due to urban growth, industrial activity, and rising population density, AUDA expansion plan marks a major step in the city’s long-term mobility and infrastructure strategy.

AUDA Project Overview
The ₹2,220 crore project is divided into two packages, covering both the eastern and western stretches of the ring road.
Package 1: Eastern Corridor
- Stretch: 37 km
- Scope: Conversion of existing road into a 6-lane carriageway
- Focus: Improving traffic flow in the eastern areas, which are rapidly urbanizing with industrial and residential developments
Package 2: Western Corridor
- Stretch: 39.25 km
- Scope: Conversion of existing road into a 6-lane carriageway
- Focus: Strengthening connectivity in the western zone, which includes major commercial hubs, IT parks, and residential clusters
Service Road Development
In addition to lane widening, AUDA has included extensive plans for service road development:
- 34 km of two-lane service roads to be upgraded into four-lane service roads
- 15 km of three-lane service roads to be expanded into four lanes
This will ensure smoother access to adjoining areas, reduce bottlenecks at junctions, and improve safety for local commuters.
Importance of the Project
The expansion of the Sardar Patel Ring Road comes at a crucial time when Ahmedabad is witnessing rapid urban growth. Here’s why this project is significant:
1. Traffic Decongestion
The ring road is one of the busiest corridors in Gujarat, handling both heavy freight and local commuter traffic. The 6-lane expansion will ease congestion and shorten travel times.
2. Boost to Economic Growth
Ahmedabad is home to major industrial clusters, SEZs, and logistics hubs. Improved road infrastructure will facilitate faster freight movement, benefiting businesses and industries.
3. Enhanced Connectivity
The ring road acts as a bypass for NH-8 (Delhi-Mumbai corridor) and connects to key highways. Its expansion will strengthen regional connectivity.
4. Urban Mobility Improvement
As Ahmedabad expands outward, peri-urban areas are becoming residential and commercial hotspots. Upgraded service roads will ensure smooth local access.
5. Future-Ready Infrastructure
The project is designed to accommodate future traffic growth, keeping in mind Ahmedabad’s role as a major metropolitan hub.
Technical Details
Aspect | Details |
---|---|
Project Authority | Ahmedabad Urban Development Authority (AUDA) |
Project Name | 6-Lane Expansion of Sardar Patel Ring Road |
Total Length | 76 km |
Tender Value | ₹2,220 crore |
Package 1 | 37 km stretch (Eastern side) |
Package 2 | 39.25 km stretch (Western side) |
Service Road Upgrade | 34 km (2-lane → 4-lane) + 15 km (3-lane → 4-lane) |
Project Aim | Reduce congestion, improve urban mobility, boost regional connectivity |
FOUR LINKS OF THE SARDAR PATEL RING ROAD
Link-1: Rajkot Highway Junction (NH-8A) to Vadodara Highway Junction (NH-8) of 14.106 KM. Link-2: Vadodara Highway Junction (NH-8) to Himatnagar Highway Junction (NH-8) of 25.518KM. Link-3: Gandhinagar Highway Junction (NH-8C) to Rajkot Highway Junction (NH-8A) of 22.862KM. Link-4: Himatnagar Highway Junction (NH-8) to Gandhinagar Highway Junction (NH-8C)of 13.827KM. |
Broader Urban Impact
The Sardar Patel Ring Road is not just a traffic corridor but also a driver of urban expansion in Ahmedabad. As the city continues to grow in all directions, the upgraded ring road will:
- Support new residential townships developing along its periphery
- Improve accessibility to GIFT City, Gujarat’s financial hub
- Strengthen last-mile connectivity to industrial parks and logistic centers
- Create smoother entry and exit points for Ahmedabad International Airport and key city highways
This aligns with AUDA’s broader vision of sustainable urban infrastructure and smart mobility solutions for the city.
Industry and Bidding Outlook
With tenders worth ₹2,220 crore, the project is expected to draw interest from leading EPC (Engineering, Procurement, Construction) contractors and infrastructure giants across India. Companies specializing in highways, expressways, and urban roadworks are likely to participate in the bidding.
Given the size and importance of the project, the bidding process will emphasize:
- Technical capability
- Experience in large-scale road projects
- Financial strength
- Commitment to quality and timelines
Timeline and Next Steps
While AUDA has floated the tenders, the final award of contracts will depend on the bidding process. Once awarded, the project is expected to begin construction within a few months. The timeline is likely to be in the range of 24–30 months, given the scale and complexity of the works.
Conclusion
The AUDA Ring Road Expansion Project is a landmark initiative for Ahmedabad’s urban future. With an investment of ₹2,220 crore, the project is set to transform the Sardar Patel Ring Road into a high-capacity, future-ready corridor.
By easing traffic congestion, strengthening connectivity, and supporting economic growth, this project will not only benefit commuters but also position Ahmedabad as a model for sustainable urban transport infrastructure.
Suggested Reads
India’s Top 10 Ring Road Projects
Ahmedabad Metro Phase 2 Progress
One thought on “AUDA Floats ₹2,220 Crore Tender for 6-Lane Expansion of Sardar Patel Ring Road in Ahmedabad”