The Raipur Dhanbad Expressway (NH / EC-07), a part of the ambitious Raipur Dhanbad Economic Corridor, is currently under construction. This 707 km long, four-lane access-controlled expressway will cut across Chhattisgarh and Jharkhand, transforming connectivity across central and eastern India.
Strategically designed under the Bharatmala Pariyojana, this expressway will promote industrialization in the region by providing faster connectivity to coal reserves, mining zones, and industrial hubs across Raipur, Bilaspur, Korba, Jashpur, Ranchi, Bokaro, and Dhanbad.
It will reduce travel time between Raipur and Dhanbad from 16 hours to just 9 hours, while also cutting the distance down from 750 km to 707 km. The corridor will be developed as a mix of greenfield and brownfield stretches — with the Raipur–Bilaspur section upgraded to a six-lane brownfield expressway, while the rest will be developed as new greenfield alignments.

Key Sections of the Raipur Dhanbad Expressway
- Raipur–Bilaspur (Brownfield) – 6 lanes
- Bilaspur–Urga (Greenfield) – 4 lanes
- Urga–Pathalgaon (Greenfield) – 4 lanes
- Pathalgaon–Gumla (Greenfield) – 4 lanes
- Gumla–Ranchi (Greenfield) – 4 lanes
- Ranchi–Bokaro (Greenfield) – 4 lanes
- Bokaro–Dhanbad (Greenfield) – 4 lanes
Raipur Dhanbad Expressway Package-Wise
Summary Table
Package Details | Section | Length (Approx.) | Type | Status / Bidders | Estimated Cost (₹ Cr.) | Package Wise Bidders Details |
---|---|---|---|---|---|---|
Pkg – 1 | Raipur – Bilaspur | ~125 km | Brownfield (6 lanes) | DPR approved | ~3,500 Cr. | Yet to be invited |
Pkg – 2 | Bilaspur – Urga | ~70 km | Greenfield (4 lanes) | Bidding stage | ~2,200 Cr. | Not disclosed |
Pkg – 3 | Urga – Pathalgaon | ~120 km | Greenfield (4 lanes) | Bidding stage | ~3,000 Cr. | Not disclosed |
Pkg – 4 | Pathalgaon – Kunkuri – CG/JH Border | 104.25 km | Greenfield (4 lanes) | Bids opened – Krishna Constructions L1 (₹1,953 Cr.) | 2,356.30 Cr. | Krishna Constructions (L1), Megha Engineering, Dilip Buildcon, PNC Infratech Click here for Details |
Pkg – 5 | Gumla – Ranchi | ~140 km | Greenfield (4 lanes) | Tendering | ~3,400 Cr. | Yet to be invited |
Pkg – 6 | Ranchi – Bokaro | ~80 km | Greenfield (4 lanes) | Tendering | ~2,000 Cr. | Yet to be invited |
Pkg – 7 | Bokaro – Dhanbad | ~68 km | Greenfield (4 lanes) | Tendering | ~1,800 Cr. | Yet to be invited |
Economic Impact
- Industrial Boost: The corridor passes through coal-rich belts and industrial towns, creating opportunities for logistics, mining, and allied industries.
- Travel Time Reduction: From 16 hours to just 9 hours between Raipur and Dhanbad.
- Seamless Connectivity: Links the Eastern Economic Corridor (Paradip Port – Bihar border) with central India.
Check Other Economic Corridors
Interested in exploring more? 👉 Click here to see the full list of ongoing and planned Economic Corridors in India